Research Portal

Displaying 11 – 19 of 19 results

Filters

Advancing Tidal Energy Turbine Operations through High Fidelity Tug Propulsion and Control Simulation Software

November 2016 – March 2017

The project objective was to develop a numerical model of a tug boat and its propulsion system to accurately predict its dynamic behaviour in turbulent tidal flows.

Environmental Effects Monitoring Project

January 2016 – January 2017

FORCE developed an Environmental Effects Monitoring Program (EEMP) to study five major subject areas: fish, marine mammals, lobster, marine noise and seabirds. The EEMP was designed to be adaptive in nature.

High-Resolution Numerical Model Resource Assessment of Minas Passage, Bay of Fundy

January 2017

Two numerical models developed by the Acadia Tidal Energy Institute are described. The models simulate the tidal flow in the Bay of Fundy, and in particular the Minas Passage. The models have different grid resolution, one suitable for site assessment and one suitable for resource assessment.

Development of High Performance Tidal Turbine Rotors

January 2013 – October 2015

This research investigated and informed novel and cost-effective engineering solutions to extract and deliver energy from tidal flows.

Value Proposition for Tidal Energy Development in Nova Scotia, Atlantic Canada and Canada

January 2014 – April 2015

This study shows there is substantial potential economic opportunity in building a tidal energy industry in Canada. It indicates that tidal energy could reduce our dependence on fossil fuels and create a new industry offering significant socio-economic benefits.

Turbulent Scale and Wake Modeling on a Horizontal Axis Turbine

January – April 2015

This project aimed to accurately simulate turbulent flow over a scaled horizontal axis tidal turbine to resolve turbulence in the near and far field regions.

Assessing Marine Mammal Presence in and near the FORCE Crown Lease Area during Winter and Early Spring

October 2013 – February 2015

This study closes the winter/spring baseline data gap via deployments of multiple, calibrated C-PODs and an icListenHF hydrophone, for the deepest sites at the FORCE Lease Area.

Turbulence and Bottom Stress in Minas Passage and Grand Passage

September 2011 – February 2015

This project aimed to investigate turbulence and bottom stress at two sites being targeted for in-stream tidal power development in Nova Scotia: Minas Passage in the Upper Bay of Fundy and Grand Passage, located between Brier and Long Island in the lower Bay of Fundy.

Seasonal Erodibility of Sediment in the Upper Bay of Fundy

February 2012 – January 2015

This project developed methods for studying sedimentation to the macro-tidal flats of the upper Bay of Fundy. The researchers looked at seasonal variation in the erodibility of sediments in tidal creeks and flats using a Gust Erosion Chamber and repeated grain size surveys.